Skip to content

In stock. Delivered across Chicagoland in 1–2 weeks.

Direct Cabinet SupplyCall

Kitchen Remodeling and Home Improvement in Bartlett

1,486 home improvement permits were filed in Bartlett over the last 24 months, at a median declared cost of $8,500. Decks & porches is the most common work. Every figure here comes from the permits Bartlett itself issued.

Key takeaways

  • 1,486 permits filed in Bartlett over 24 months, across 15 kinds of work.
  • Median declared cost of $8,500 across 1,469 permits that stated one.
  • Decks & porches leads with 293 permits; 21 describe kitchen work.
  • Bartlett's ZIP codes extend beyond the city limits, so this page covers the city rather than any one ZIP.

Permit activity

1,486 permits were issued in Bartlett over the 24-month window, filed by 42 distinct contractors.

Permits, 24 months
1,486
Kinds of work
15
Median declared cost
$8,500

as stated by the applicant

Contractors
42
Permits over 24 months: Bartlett against the other places we cover.Chicago44,869Rockford18,504Schaumburg9,545Orland Park7,250Berwyn6,254Cicero5,287Bartlett (here)1,486
Permits over 24 months: Bartlett against the other places we cover.

What people are building in Bartlett

Decks & porches is the most permitted work, with 293 permits. 87% of permits carried a description specific enough to classify.

Permits by type of work in Bartlett, last 24 months.Decks & porches293Windows & doors209Roofing174Fences112Heating & cooling104Solar95Plumbing65General alterations61Siding & soffits58Electrical54
Permits by type of work in Bartlett, last 24 months.
Permits filed in Bartlett by quarter. Partial quarters at each end are excluded.2024 Q4372025 Q1832025 Q21462025 Q33892025 Q41492026 Q1104
Permits filed in Bartlett by quarter. Partial quarters at each end are excluded.

New homes being built in Bartlett

260 new housing units were permitted in Bartlett across the 31 months it reported between January 2024 and July 2026, every month of the 31-month window.

New units permitted
260

31 reported months

Single-family homes
260

260 buildings

Per reported month
8.4

all units

Declared cost per home
$200,578

single-family, as filed

New housing units permitted in Bartlett by month, as first published. Every month was reported on time.24/01324/02224/031024/04024/051724/062324/071224/081324/091824/101024/11324/12125/01425/02525/03725/04325/051425/061025/07825/08725/09025/102425/11425/12226/01526/021226/03926/041026/05926/06326/0712
New housing units permitted in Bartlett by month, as first published. Every month was reported on time.

Who is doing the work in Bartlett

42 distinct contractors pulled permits in Bartlett. Appearing here reflects permit volume only — it is not a recommendation or a ranking of quality.

Contractors by permit count in Bartlett.
ContractorPermitsAvg declared cost
Spring Lakes Mobile Homes13$500
New England Builders8$8,104
The Bridgewater Group8$14,344
Hh Premier Properties7$192,379
A&R Spaces Llc4$11,775
Ffii Carillon Owner Llc4$1,493,063
Gmt Group Llc4$25,775
Jca Properties4$23,380
Cicf Ii - Il1Bo4, Llc3$198,700
Indeed Chicago Llc3$7,300

Pricing a kitchen in Bartlett?

None of the figures above price cabinets. Measure your wall and the estimator prices it from what we actually stock — about five minutes, with a drawing of every wall.

Common questions about remodeling in Bartlett

How much does a kitchen remodel cost in Bartlett?

21 of the permits filed in Bartlett describe kitchen work. Across all 1,486 home improvement permits the median declared cost was $8,500 — a figure covering every kind of work, written by the applicant rather than appraised. Treat it as the scale of permitted work, not a kitchen quote. For cabinets we quote from stock, usually the same week.

What kind of work is most common in Bartlett?

Decks & porches accounts for 293 permits, more than any other category, out of 15 distinct kinds of work.

Do you deliver cabinets to Bartlett?

Yes. We deliver across Chicagoland from the warehouse at 810 Greenleaf Ave, Elk Grove Village. Cabinets are in stock, so delivery is normally one to two weeks rather than the four or more a special order takes.

Where these numbers come from

Permit figures are counted from the building permit records Bartlett publishes, for the 24 months to the date of the last pipeline run, restricted to residential work.

  • Declared cost is the value the applicant entered on the permit — not an appraisal, a bid, or the final cost. 1,469 of 1,486 permits stated one.
  • Why a city and not a ZIP. A ZIP page needs most of the ZIP to sit inside an authority whose permits we read. That holds across Chicago and rarely elsewhere, because a suburb's ZIP codes extend past its boundary. A city page has no such problem: the jurisdiction is exactly what we ingested.
  • Figures cover the 24 months from 25 August 2024, last rebuilt 8 September 2026.

Other places we cover

Get a Free Quote