Skip to content

In stock. Delivered across Chicagoland in 1–2 weeks.

Direct Cabinet SupplyCall

New Home Construction in Bourbonnais, IL

44 new housing units were permitted in Bourbonnais across the 28 months it reported since January 2024, 36 of them single-family homes at an average declared construction cost of $298,258. Every figure comes from what Bourbonnais itself reported to the U.S. Census Bureau.

Key takeaways

  • 44 new housing units permitted over 28 reported months; 36 are single-family.
  • Average declared construction cost of $298,258 per single-family home.
  • 90th of 113 places we track on new units per reported month.
  • 3 of 31 months were never reported to the Census and are excluded, not estimated.

New residential construction

44 new housing units were permitted in Bourbonnais across the 28 months it reported between January 2024 and July 2026. 3 of the 31 months were never reported to the Census and are excluded, not estimated.

New units permitted
44

28 reported months

Single-family homes
36

36 buildings

Per reported month
1.6

all units

Declared cost per home
$298,258

single-family, as filed

New housing units permitted in Bourbonnais by month, as first published. 4 greyed months had no report when their file was released; those reported late are counted in the totals and the year table, not in this chart.24/01024/02024/03224/04324/05224/06424/07624/08024/09124/10024/11224/12025/01025/02825/03225/04125/05125/06225/07125/08125/09325/10125/11225/12126/01026/02026/03026/04026/05026/06026/070
New housing units permitted in Bourbonnais by month, as first published. 4 greyed months had no report when their file was released; those reported late are counted in the totals and the year table, not in this chart.

18% of the units were in buildings of two or more homes; 82% were single-family houses.

Reported-only totals for Bourbonnais as published by the Census Bureau, including late reports.
PeriodMonths reportedSingle-familyAll unitsDeclared value, single-family
202412 of 121220$3,452,400
202512 of 122323$7,014,900
2026 to July4 of 711$270,000

Bourbonnais against other places

On new units per reported month, Bourbonnais ranks 90th of the 113 places we track without their own permit records. The rate is used, not the total, so a place that reported fewer months is not made to look quieter.

New housing units per reported month, last 24 months.Plainfield50.16Aurora48.97Oswego36.52Joliet31.35Menomonee Falls28.77Crystal Lake28.13Huntley27.71Deerfield25.95Bourbonnais (here)1.57
New housing units per reported month, last 24 months.

Fitting out a new kitchen in Bourbonnais?

Nothing above prices cabinets. Measure the wall and the estimator prices it from what we actually stock — about five minutes, with a drawing of every wall. Builders: the same tool works per unit.

Common questions about building in Bourbonnais

How many new homes are being built in Bourbonnais?

44 new housing units were permitted in Bourbonnais across the 28 months it reported to the Census Bureau between January 2024 and July 2026, 36 of them single-family houses. That is 1.6 units per reported month. A permit is authorisation to build, so some of these are still under construction.

What does a new house in Bourbonnais cost to build?

The declared construction value averaged $298,258 per single-family home. That is the figure the builder stated on the permit — the cost of construction, not the land and not the sale price — so treat it as the scale of what is being built rather than a home value.

Do you supply cabinets for new construction in Bourbonnais?

Yes. Builders and homeowners fitting out a new house buy from the same stock. We deliver from the warehouse at 810 Greenleaf Ave, Elk Grove Village; cabinets are in stock, so a new-build kitchen is normally one to two weeks from order to delivery.

Where these numbers come from

Every permit-issuing place in the country reports new residential construction to the U.S. Census Bureau each month. This page uses Bourbonnais's own reports and nothing else.

  • Reported months only. When a place misses a month, the Census Bureau publishes an estimate in its place. Every total here comes from the Bureau's reported-only figures in its annual and year-to-date files, which include late reports: 28 of 31 months. The monthly chart is the series as first published, so a month reported late appears greyed there but is counted in the totals. Comparisons use units per reported month for the same reason.
  • New construction, not remodeling. The survey counts new privately-owned housing units. Additions, alterations and kitchen remodels are not in it. Where we read a place's own permit records, it has a remodeling page instead — see the places listed below.
  • Declared value is the construction cost the builder stated on the permit — not land, not a sale price, not an appraisal.
  • Latest month in the record: July 2026. Rebuilt 8 September 2026. Source: U.S. Census Bureau, Building Permits Survey, place-level monthly files.

Places whose remodeling permits we read

Bourbonnais publishes no permit records we can read, so this page covers new construction. These places do, and each has a page on what people are remodeling.

Other places by new construction

Get a Free Quote