Skip to content

In stock. Delivered across Chicagoland in 1–2 weeks.

Direct Cabinet SupplyCall

New Home Construction in Huntley, IL

859 new housing units were permitted in Huntley across the 31 months it reported since January 2024, 771 of them single-family homes at an average declared construction cost of $252,685. Every figure comes from what Huntley itself reported to the U.S. Census Bureau.

Key takeaways

  • 859 new housing units permitted over 31 reported months; 771 are single-family.
  • Average declared construction cost of $252,685 per single-family home.
  • 7th of 113 places we track on new units per reported month.
  • Huntley reported every month of the 31-month window.

New residential construction

859 new housing units were permitted in Huntley across the 31 months it reported between January 2024 and July 2026, every month of the 31-month window.

New units permitted
859

31 reported months

Single-family homes
771

771 buildings

Per reported month
27.7

all units

Declared cost per home
$252,685

single-family, as filed

New housing units permitted in Huntley by month, as first published. Every month was reported on time.24/012124/021324/032524/042624/054024/063824/071624/08624/091724/103724/114024/12925/013225/022925/032225/0412825/052825/064125/075125/082125/092125/10825/11125/121226/01826/021026/031226/041526/051626/063126/0776
New housing units permitted in Huntley by month, as first published. Every month was reported on time.

10% of the units were in buildings of two or more homes; 90% were single-family houses.

Reported-only totals for Huntley as published by the Census Bureau, including late reports.
PeriodMonths reportedSingle-familyAll unitsDeclared value, single-family
202412 of 12297297$73,545,942
202512 of 12306394$63,332,226
2026 to July7 of 7168168$57,942,007

Huntley against other places

On new units per reported month, Huntley ranks 7th of the 113 places we track without their own permit records. The rate is used, not the total, so a place that reported fewer months is not made to look quieter.

New housing units per reported month, last 24 months.Plainfield50.16Aurora48.97Oswego36.52Joliet31.35Menomonee Falls28.77Crystal Lake28.13Huntley (here)27.71Deerfield25.95
New housing units per reported month, last 24 months.

Fitting out a new kitchen in Huntley?

Nothing above prices cabinets. Measure the wall and the estimator prices it from what we actually stock — about five minutes, with a drawing of every wall. Builders: the same tool works per unit.

Common questions about building in Huntley

How many new homes are being built in Huntley?

859 new housing units were permitted in Huntley across the 31 months it reported to the Census Bureau between January 2024 and July 2026, 771 of them single-family houses. That is 27.7 units per reported month. A permit is authorisation to build, so some of these are still under construction.

What does a new house in Huntley cost to build?

The declared construction value averaged $252,685 per single-family home. That is the figure the builder stated on the permit — the cost of construction, not the land and not the sale price — so treat it as the scale of what is being built rather than a home value.

Do you supply cabinets for new construction in Huntley?

Yes. Builders and homeowners fitting out a new house buy from the same stock. We deliver from the warehouse at 810 Greenleaf Ave, Elk Grove Village; cabinets are in stock, so a new-build kitchen is normally one to two weeks from order to delivery.

Where these numbers come from

Every permit-issuing place in the country reports new residential construction to the U.S. Census Bureau each month. This page uses Huntley's own reports and nothing else.

  • Reported months only. When a place misses a month, the Census Bureau publishes an estimate in its place. Every total here comes from the Bureau's reported-only figures in its annual and year-to-date files, which include late reports: 31 of 31 months. The monthly chart is the series as first published, so a month reported late appears greyed there but is counted in the totals. Comparisons use units per reported month for the same reason.
  • New construction, not remodeling. The survey counts new privately-owned housing units. Additions, alterations and kitchen remodels are not in it. Where we read a place's own permit records, it has a remodeling page instead — see the places listed below.
  • Declared value is the construction cost the builder stated on the permit — not land, not a sale price, not an appraisal.
  • Latest month in the record: July 2026. Rebuilt 8 September 2026. Source: U.S. Census Bureau, Building Permits Survey, place-level monthly files.

Places whose remodeling permits we read

Huntley publishes no permit records we can read, so this page covers new construction. These places do, and each has a page on what people are remodeling.

Other places by new construction

Get a Free Quote